Grant Management

The following list presents the MTA's final program of projects for a portion of the Section 5307 funding from Federal Fiscal Year 2010. The projects have received federal funding in the Federal Transit Administration (FTA) grant NY-90-X663, executed September 12, 2011. The public hearings for the proposed program of projects were held by the Metropolitan Transportation Authority, on September 2, 2009. This list is provided to the public as required by 49 USC 5307.

Agency PIN Description Federal Local Total
LIRR L603/01/TA 12.24.03 2010 Annual Track Program $21,450,000 $21,450,000
LIRR L603/01/TF 12.22.20 Construction Equipment 4,800,000 $553 4,800,553
LIRR L604/01/BE 12.24.05 Construct 3 Montauk Branch Bridges 26,200,000 26,200,000
LIRR L605/02/LC 12.61.01 Speonk - Montauk Signalization 10,000,000 10,000,000
LIRR L607/01/AF 12.54.01 Third Rail - Disconnect Switches 1,000,000 1,000,000
LIRR L607/01/AL 12.54.20 Power Pole Line Replacement 3,000,000 3,000,000
LIRR L607/01/AN 12.54.01 Third Rail Feeder Cable Upgrade 2,500,000 2,500,000
MNR M502-02-03 12.34.02 Poughkeepsie Station Building 458,736 458,736
MNR M603-01-02 12.24.03 Turnouts: Mainline/High Speed 9,875,000 9,875,000
MNR M603-01-04 12.24.03 Turnouts:Yards/Sidings 1,404,000 1,404,000
MNR M603-01-06 12.24.03 Cyclical Replacement Insulated Joints 500,000 500,000
MNR M603-02-01 12.24.03 Replace Timbers/Undergrade Bridges 900,000 900,000
MNR M603-02-02 12.24.03 Rehab. Culverts/Railtop Culverts 1,200,000 1,200,000
MNR M603-03-03 12.24.03 Rehab. of Moodna Viaduct 5,500,000 5,500,000
MNR M605-01-03 12.54.01 Harlem & Hudson Lines Power Imp. 4,500,000 4,500,000
MNR M606-01-01 12.44.05 Harmon Shop Imp.- Phase IV 25,508,000 25,508,000
NYCT CM03-5106 12.44.05 207th St Overhaul Shop: Electrical System 18,724,000 18,724,000
NYCT CM03-5106H 12.44.05 207th Street Overhaul Shop: Heating System 12,646,000 12,646,000
NYCT CM09-7115 12.12.21 Purchase 290 B-Division R179 Subway Cars 83,659,690 83,659,690
NYCT MW12-6554 12.24.03 Rehabilitate 6 Deep Wells: Crosstown Line 10,059,000 10,059,000
NYCT MW18-7228 12.24.04 Tunnel Light:11 St Portal-Qns Pl 60th St Conn 5,440,000 5,440,000
NYCT MW18-7394 12.24.04 Tunl Lgt:4th Av-Church Av Portal (Loc) Culver 28,208,000 28,208,000
NYCT MW22-7069 12.24.04 Rehabilitate Emergency Exits at 50 Locations 4,000,000 4,000,000
NYCT MW25-5409B12.53.20 New Duct Banks Lenox Av:141st-148 St Lnx Ln 15,000,000 15,000,000
NYCT MW25-6699 12.24.03 Rehab CBH 292/293 Albermarle Rd Nostrand Ln 6,980,000 6,980,000
NYCT MW26-6809 12.24.03 2010 In-House Mainline Track Rehab 99,054,000 99,054,000
NYCT MW28-6810 12.24.03 2010 In-House Mainline Switch Replacement 24,795,000 24,795,000
NYCT MW38-6925 12.64.01 Replace Solid State Signal Equipment-5 Locs 6,421,000 6,421,000
NYCT MW44-6896 12.24.03 2010 In-House Welded Rail Program (CWR) 1,875,000 1,875,000
NYCT MW46-6811 12.24.03 2010 In-House Yard Track Rehabilitation 579,000 579,000
NYCT MW49-6573B 12.24.03 Elevated Structure Rehab:Viaduct-Rockaway Ln 39,767,000 39,767,000
NYCT MW49-6590 12.24.03 Rehab El Struct:Cypress Hills-130 St Jamc Ln 4,250,000 4,250,000
NYCT MW51-6812 12.24.03 2010 Yard Switch Replacement In-House 1,080,000 1,080,000
NYCT MW62-6571 12.24.06 Ln Struct Overcoat:Rockaway Blvd-Hammel`s Wye 4,419,000 4,419,000
NYCT MW62-6596 12.24.06 Ln Struct Overcoat: Cypress Hills to 130 St 19,434,000 19,434,000
NYCT MW62-6927 12.24.06 Overcoat Painting: 15 Bridges, Brighton Line 8,162,000 8,162,000
NYCT PW02-6116A 12.54.03 Rehabilitate 5 Substation Enclosures 15,165,000 15,165,000
NYCT PW09-6446 12.54.03 Rehabilitation of 10th Street Substation 17,370,000 17,370,000
NYCT ST04-6955 12.34.02 ADA: Utica Avenue Station-Fulton Line 17,600,000 17,600,000
NYCT ST04-6955 12.94.09 ADA: Utica Avenue Station-Fulton Line 2,600,000 2,600,000
NYCT ST04-7112 12.34.02 ADA: Platform Edge Improve-34th St, Brdway Ln 4,297,000 4,297,000
NYCT ST04-7113 12.34.02 ADA: Platform Edge Improve-34th St, 6th Av Ln 4,297,000 4,297,000
NYCT ST07-6401 12.34.02 Rehab Smith-9th Streets Station: Culver Line 29,772,000 29,772,000
NYCT ST21-6905 12.34.02 Station Improvements: 4th Ave Sta-Culver Line 10,868,000 10,868,000
$615,317,426 $553 $615,317,979